Quickly calculate the extra refrigerant needed when your pipe run exceeds the manufacturer's standard length. Enter the additional metres and the per-metre charge rate.
When the interconnecting pipe run on a split system exceeds the standard length included in the factory charge (typically 7.5 m), additional refrigerant must be added to maintain proper system performance.
The additional charge per metre depends on the refrigerant type, pipe diameter, and manufacturer specification. Always refer to the installation manual for the exact value.
Most manufacturers include a factory charge for 7.5 m of pipe. Any pipework beyond this length requires additional refrigerant per the manufacturer's specification.
Check the installation manual. It lists the additional refrigerant per metre for each pipe diameter. Typical values are 20–40 g/m for residential systems.
Calculate evaporator superheat from suction line and saturation temperatures.
Calculate liquid line subcooling to verify condenser charge and performance.
Convert refrigerant pressure to temperature and vice versa for common refrigerants.
Calculate total refrigerant charge including factory charge and pipe length allowance.
Post a request and get competing quotes from rated HVAC engineers nationwide.